Surge Protector Power Strip,Smart Power Strip,Outdoor Power Strip,Usb Power Strip Yang Guang Auli Electronic Appliances Co., Ltd. , https://www.ygpowerstrips.com
The total investment of the Taiwan Cubs Science Park project is 2.8 billion yuan, with a planned area of ​​over 2,000 mu. It is expected that the construction of the park will be completed at the beginning of the third year and basically completed in five years. The industries that are stationed in the park need to be high-tech industries and meet environmental protection requirements. Taiwan Hande Technology will be responsible for planning and design and foreign investment.
It is understood that Hande Technology has invested in the LED optoelectronic materials research and development production project, with a planned investment of 1.4 billion yuan and a fixed asset investment of 400 million. The project is expected to start construction before June 30 and complete all within 2 years. Fixed assets investment. After the project is completed and put into production, the annual output value will be about 1.8 billion yuan, and the profit and tax will be 180 million yuan.
The LED optoelectronic technology comprehensive development project invested by Taiwan Jinghua Technology is planned to invest RMB 500 million and the planned area is more than 200 mu. It is planned to be completed within three years. After the completion of the project, Xinxiang will become a semiconductor lighting engineering production base with a relatively large influence and a comprehensive development of “Silicon Valleyâ€.
Taiwanese businessmen want to build LED "Silicon Valley" in Henan
The Taiwan Lion Cub Science Park project invested by Taiwan Hender Technology Co., Ltd., the LED optoelectronic material research and development production project, and the LED optoelectronic technology comprehensive development project invested by Taiwan Jinghua Technology Management Co., Ltd. officially settled in Yuanyang County, Henan Province.